Loft – an update from the past

Mainly cos I didn’t get round to doing it. So continuing on from the last exciting post, Loz the plasterer (not Loz who works at reception in BCC) had finished and so the painting began.

Smooth Walls and Big camera bag storage.
Almost Done!

The OSB painted over quite well
Almost Done!

Note the new floor and banister top
Almost Done!

So good I had to take 2 pictures
Almost Done!

Wires
Almost Done!

Superb tripod storage (triangle bit), and above hatch box storage (camera boxes)
Almost Done!

So nearly there………..